Tik Tok green
With 60% of its site area landscaped, Verdant is the next generation of green, wellness-focused workspace. Arriving in full bloom, Q3 2024.
📍Location
🏢Building Details
135,000 sq ft., 10-storey
Under construction, due to complete Q3 2024
Comprehensive extension + redevelopment of 150 Aldersgate St and 3-4 Bartholomew Place – with dual East + West entrances
👷🏾♀️Developer & Contractor
Sol Zakay – Chairman & CEO @ Topland Group
Jonathan Chenery – Partner @ Beltane Asset Management
✍️Architect & Designers
Ed Williams – Partner @ Fletcher Priest Architects
Jonathan Kendall – Partner @ Fletcher Priest Architects
Joe Sweeney – Associate Partner @ Fletcher Priest Architects
Chris Radley – Senior Associate @ Fletcher Priest Architects
🌱Sustainability
Low embodied carbon: approx. 80% of existing structure retained + reused
Targeting BREEAM Excellent + EPC A
Pre-demolition audit: maximises recovery of material for high grade or value applications + guides design
Zero fossil fuels used in building services: all-electric energy strategy supplied by VRFs + electric heaters = 81 tonnes of CO2 saved per year
Naturally ventilated façade
🥦 Wellbeing
Double the required Urban Greening Factor with 60% of site landscaped: terrace on every floor (excluding 1st), biodiverse roofs + vertical greening
250 bicycle spaces + electric bike charging points + dedicated Brompton lockers + bike lift
Ground floor café and lounge
Variety of floorplate sizes for maximum flexibility – up to 17,000 sq ft on the lower floors
Exceptional connectivity: epicentre of London’s Cultural Mile + 3-min walk from Elizabeth Line
🎈Bonus feature
They have secured social media giant TikTok in a major full office prelet – just 100 yards from their Kaleidoscope building UK HQ. A big vote of confidence for the London market.
🔗 Check it out
Comments